ASTER Observation Interruption

Oct 01, 2007
By: LP DAAC

During the period October 2-7, 2007, new ASTER data collection will be interrupted due to required engineering activity involving the ASTER SWIR subsystem on the Terra spacecraft. It is possible that this interruption may extend for longer than this period. ASTER data products in the LP DAAC archive will remain available during this interruption, except during scheduled LP DAAC system maintenance.

If you have any questions, please contact LP DAAC User Services.